MeterFair
DemoExplore with demo organizations and figures. Changes reset on reload.

AetherScale Ypsilanti Phase I (100 MW)

AetherScale Infrastructure Corp. Committed to 16,000 CIC a year at full design load. What it owes each quarter follows its electricity meter. Escrow is held by a licensed escrow agent, not by this platform.

Load this quarter
85.0%
of a full design-load quarter
Owed this quarter
3,400.0 CIC
16,000 / 4 x 0.850
Shortfall
0.0 CIC
Every line is met
Escrow balance
$4,600,000
$4,600,000 required

Meter readings, Jul to Sep 2026

Credits bought from other facilities

At most 850.0 CIC of this quarter's obligation can be met with bought credits. They only fill a gap in their own category, and never a dividend or rebate.

Cash received by benefit operators

Settlement by commitment

CommitmentOwedDeliveredBoughtShortSurplus it may sell
Resident dividend (cash)1,275.01,500.00.00.0not tradable
Ratepayer rebate (cash)1,062.51,250.00.00.0not tradable
Peak-hour energy export318.81,312.50.00.0993.8
Water not drawn vs. baseline0.0532.20.00.0not tradable
Public infrastructure funding255.0300.00.00.045.0
Waste heat delivered488.8598.00.00.0109.3

All figures in CIC. Each commitment is settled on its own, so extra heat cannot make up for a missed dividend.

Enforcement

  1. Compliant→
  2. 30-day cure notice→
  3. Escrow drawn down→
  4. Tax abatement suspended

Try lowering the dividend payment on the left, then settle the quarter.

For meter and utility systems

Readings can be posted to the API. It returns the same settlement shown above.

POST /api/telemetry/ingest { "facility_id": "cccccccc-1111-1111-1111-cccccccccccc", "period_start": "2026-07-01", "period_end": "2026-09-30", "mwh_consumed": 158227.5, "grid_export_mwh": 8400, "water_consumed_gal": 0, "thermal_exported_mmbtu": 52000 }